& emsp; & emsp;Hydropower installation is a very important item in the family,It will involve a lot of problems。After all,Our life is inseparable from hydropower。These two are the main sources of our survival,belongs to the concealed project。We cannot underestimate the safety of home decoration。
& emsp; & emsp; from the beginning to digging to the latter wiring、Inspection and acceptance is very important,But we should also consider our needs,For example, where the water pipe needs hot water,Where is it,Do you need positioning, etc.,and whether the pressure pressure is sufficient。Next,We will introduce hydropower installation process and related precautions。
& emsp; & emsp; 1. Pipe groove
& emsp; & emsp; when installing hydropower,First of all, you need a pipeline groove。Pipe grooves include two aspects: one is the water pipe slot,The second is the wire slot。Pipeline groove,The owner can check the quality at the scene,Make sure that the horizontal and vertical lines pop up before the slot are popped up,Construction of the line。
& emsp; & emsp; 2. Water pipeline installation
& emsp; & emsp; water pipe installation in water and electricity installation is very important,Water pipe materials are mostly PPR pipes、Aluminum Plastic Tube,Water pipe installation should also pay attention to the placement of the faucet,The owner personally supervises and observe,Make sure the practicality。
& emsp; & emsp; 3, wire wiring
& emsp; & emsp; wire is a key material for hydropower installation。The common wires common on the market have copper core wires above 2.5-6 square meters。When the wire is installed,Strong and weak electricity、Switch、Air conditioning socket、Electric sockets should be wiring separately,Make the latter panel more flat。
& emsp; & emsp; 4. Water pipe inspection
& emsp; & emsp; after the construction is completed,You must carefully check whether the water pipe has quality problems,Eliminate the hidden dangers of waterway。During inspection,Pressure method,First of all gambling gambling,Try water with a pressure gauge。After suppression,Check all pipes and joints。If there is no leakage,Explanation of the installation of water pipe。
& emsp; & emsp; cloth tube、Line?,Make sure that each wire can be twitch。
& emsp; & emsp; ◆ All census line pipes are reorganized along the wall,Make sure that the wires in the pipeline can twitch,The ratio of all line diameters should be carried out according to actual needs。The wires in all pipelines should be divided into color,It is strictly forbidden to use wires of the same color in the pipeline。
& emsp; & emsp; ◆ The layout of all ground wire tubes ** uses diameter φ20pvc tube,​​Yuba reserved tube must use φ20PVC tube,Ground tube 4 square wire cloth φ20 tube,6 square wire cloth φ25pvc tube,10 square line layout φ32pvc tube。
& emsp; & emsp; ◆ The total area of ​​the power cord in all pipes and pipelines must not exceed 40%of the cross -sectional area of ​​the pipeline,To ensure the heat dissipation space during the use of the wire。All wires in the pipeline must not have joint and distorted connection。
& emsp; & emsp; ◆ All sockets、Switching header,The length reserved in the dark box must be greater than 15cm,Place with a wall plate and marble,Reserve 20cm or more。
& emsp; & emsp; ◆ The switches and sockets of all rooms are installed in place。The cable header of the dew must be firmly connected with a thread hat and terminal,The wire should be raised and pushed into the dark box。All line heads must not be exposed to the wall,To prevent electric shock。
& emsp; & emsp; ◆ Weak electric cross position,Weak wire tube must be wrapped in tin foil,Prevent mutual interference。
& emsp; & emsp; ◆ All water pipes ** first bounce line and then install,Fix with hanging tendons。Each hanging tendon plus a layer of rubber ring,60cm between hanging tendons,Make sure that the water pipe is uniform in the later use,No abnormality。
& emsp; & emsp; ◆ All water pipe ** arranges from the top,Horizontal vertical,Fix with hanging tendons,Hot water pipe and circulating water pipe,Black thermal insulation cotton insulation。
& emsp; & emsp; ◆ Very obvious,Waterproof is a layer of waterproof slurry brushed in front of tiles。General decoration companies do well,but N years later,When the waterproof mulch reaches the ** period of time,The question will be exposed。Don't miss it before,Loom now。Why? Because waterproof pulp can only guarantee for so long。Expressing over time,Waterproof performance decreases,Places with weak construction will be exposed,Just like the paint on the wall will be peeled when it comes to **。(Waterproof warranty is only 5 years)
& emsp; & emsp; ◆ So,Dark Waterproof,is the shadow waterproof particularly important。During the decoration process,If the waterproof water prevention is done well,Astronomical Waterproof Pulfu function decreases,will play a great role。
& emsp; & emsp; ◆ What is dark waterproof? It is a physical program made before the water and electricity construction before the ground waterproof,that is the water flow to the low point,first quoted and then blocked:
& emsp; & emsp; 1. After hydropower,Block all ground drainage pipes and ground grooves with the leakage king。(Jumping off the building、The villa should be suspended before the leak)
& emsp; & emsp; 2. There are plans to find flat in the bathroom ground,Start from the threshold of the bathroom,Go to the bathroom to do cement slope,Introduce the water into a floor drain
& emsp; & emsp; 3. According to different shower room styles,Make concrete water stops on the ground (generally 8 cm wide,6 cm high)
& emsp; & emsp; 4. Use cement at the threshold of the bathroom to make waterproof cents (the width is the same as the wall of the bathroom,height 6cm)。